Tuesday, March 1, 2011

Comrade Xu Jinglei home inspection found a few small problems and small experience!

 These days, purple is the new route for housing owners and check acceptance, there are a few friends so that I accompanied the inspection. Although the cold weather, outside temperature is only -6., I gladly accepted.
Inspection room , summed up a few issues Zijin Shinkansen and how a solution is not necessarily correct, wrong with the focus also hope the experts to give a large correction equipment. These problems may exist in other cells, hoping to give the students will be  some help.
began on the map and description:
Below this picture is the beginning of the inspection room, first check the quality of entrance doors to see if there is no deformation, the phenomenon of Diaoqi, check the hinges, locks use is normal to see seals for damage. (In general, these problems can be solved, but the developer can give the local small Diaoqi amendment?)
Next, check whether the normal operation of the meter, Zijin Shinkansen developers set aside 60 to the owner of electricity, purchase electricity from the card until after the owners will be automatically deducted.
home, check what video intercom system.
Shinkansen part of the Grand home owners living room, bedroom, after meeting with the cement surface of the ground situation, that previously had a crack, break even if the surface of the water slurry is not necessary to allow developers to repair, and repair work is the surface, might as well be handled in the future so that the decoration company. < br> Zijin Shinkansen house, I saw a lot of beams, beams to do is the following wall thickness, the increase of renovation costs, the future of the Door installation, leveling to deal with before they can be.
for windows border of the rift, I propose to this, the future approach decoration company can still see the problem before it is processed, you can focus on treatment.
the picture below you can see, based on yin and yang angle is not straight, some owners think that there The house can be directly sanding, painting after the treatment, I said do not meet the standard decoration, if you can rent.
cable is not in the middle of the living room, not in the middle of the bedroom, an increase in the future renovation costs.
home inspection, we found that all ports are in too much air conditioning the house, after the pipe decorative cover is the tightly covered for?
Zijin Shinkansen glass house is big, has a glass base ; sign stating that the glass has been processed steel.
next step is to check water and electricity, relatively weak line of well-considered, with or without hole socket, but do not know the future of the transformer into them, can close the lid?
inspection room, to check each set of heating gas is normal, the best have to debug each of temperature control valve twice.
kitchen wall near the top of the balcony and found that the surface treatment of the underlying plaster, remember decoration must let the time to cement the base worker eradication, then re-plaster before tiling.
here to drain the toilet and drain well around the handle to see if there is no space around the crack phenomenon, if so, be sure to let the developer to repair, then cover water testing must be done.
location of the toilet water really flattered, how packets riser? ask the developer can adjust the water (expected to be difficult)
air vents are two screws each, and I worry about self-tapping screws in the wet environment in the long break, the future role of the check valve will be lost.
the handle of the second floor above the gas pipeline are not, I that should be accompanied.
give you today to bring these, you can explore all the issues! only hope the owners see problems and find reasonable solutions!

No comments: